Construction Contractor Selection in Taiwan Using AHP

  • Chiang F
  • F. Yu V
  • et al.
N/ACitations
Citations of this article
33Readers
Mendeley users who have this article in their library.

Abstract

In Taiwan, construction-project owners sometimes divide contractor selection into two phases: prequalification and final selection. The first phase entails evaluating the contractors' prequalifications and is a multi-criteria decision-making (MCDM) process, with contractors evaluated based on the weighted sum of their criteria scores. However, the criteria weights are usually determined according to the opinions of the project owners or professionals and may have some shortcomings. This study applies the analytic hierarchy process (AHP) to determine criteria weights and overcome these shortcomings. First, this study determines the appropriate evaluation criteria and constructs the hierarchical structure of the criteria. Second, experts' opinions are analyzed to calculate the following criteria weights: technical ability (0.243), management capability (0.239), financial soundness (0.219), reputation (0.168) and health and safety (0.131). The model proposed in this study for evaluating contractors' prequalifications can serve as a good reference for project owners in the process of selecting contractors.

Cite

CITATION STYLE

APA

Chiang, F.-Y., F. Yu, V., & Luarn, P. (2017). Construction Contractor Selection in Taiwan Using AHP. International Journal of Engineering and Technology, 9(3), 211–215. https://doi.org/10.7763/ijet.2017.v9.972

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free