In-furnace conditions as prerequisites for proper use and design of mud to control blast furnace taphole length

28Citations
Citations of this article
8Readers
Mendeley users who have this article in their library.

Abstract

Increase in taphole length can be achieved if the taphole mud as injected stay at around the in-furnace taphole opening and sinters there. This can only be possible if the coke column and the mud mass make a good contact at the in-furnace taphole opening. Theoretical calculation of the penetration depth of the coke column into the hearth showed that the degree of contact of the coke column with the mud mass may change in normal operation of blast furnace. The degree of the contact can be controlled by controlling the raceway depth of tuyeres above the taphole concerned.

Cite

CITATION STYLE

APA

Tsuchiya, N., Fukutake, T., Yamauchi, Y., & Matsumoto, T. (1998). In-furnace conditions as prerequisites for proper use and design of mud to control blast furnace taphole length. ISIJ International, 38(2), 116–125. https://doi.org/10.2355/isijinternational.38.116

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free