Definite time over-current protection on transmission line using MATLAB/Simulink

9Citations
Citations of this article
13Readers
Mendeley users who have this article in their library.

Abstract

This paper has investigated the application of the definite time over-current (DTOC) which reacts to protect the breaker from damage during the occurrence of over-current in the transmission lines. After a distance relay, this kind of over-current relay is utilized as backup protection. The over-current relay will provide a signal after a predetermined amount of time delay, and the breaker will trip if the distance relay does not detect a line failure. As a result, this over-current relay functions with a time delay that is just slightly longer than the combined working times of the distance relay and the breaker. This DTOC is tested for various types of faults which are 3-phase fault occurring at load 1, 3-phase fault occurring at load 2, a 3-phase fault occurring before primary protection, and the behaviour of voltage and current with a failed primary protection. All the results will be obtained using the MATLAB/Simulink software package.

Cite

CITATION STYLE

APA

Taha, T. A., Zaynal, H. I., Hussain, A. S. T., Desa, H., & Taha, F. H. (2024). Definite time over-current protection on transmission line using MATLAB/Simulink. Bulletin of Electrical Engineering and Informatics, 13(2), 713–723. https://doi.org/10.11591/eei.v13i2.5301

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free