Abstract
The lack of wind speed capacity and the emission of photons from sunlight are the problem in a hybrid system of photovoltaic (PV) panels and wind turbines. To overcome this shortcoming, the incremental conductance (IC) algorithm is applied that could control the converter work cycle and the switching of the buck boost therefore maximum efficiency of maximum power point tracking (MPPT) is reached. The operation of the PV-wind hybrid system, consisting of a 100 W PV array device and a 400 W wind subsystem, 12 V/100 Ah battery energy storage and LED, the PV-wind system requires a hybrid controller for battery charging and usage and load lamp and it’s conducted in experimental setup. The experimental has shown that an average increase in power generated was 38.8% compared to a single system of PV panels or a single wind turbine sub-system. Therefore, the potential opportunities for increasing power production in the tropics wheather could be carried out and applied with this model.
Author supplied keywords
Cite
CITATION STYLE
Utomo, S. B., Setiawan, I., Fajar, B., Winoto, S. H., & Marwanto, A. (2022). Optimizing of the installed capacity of hybrid renewable energy with a modified MPPT model. International Journal of Electrical and Computer Engineering, 12(1), 73–81. https://doi.org/10.11591/ijece.v12i1.pp73-81
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.