Simulation and optimization of scrap wagon dismantling system based on Plant Simulation

1Citations
Citations of this article
14Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

Based on the existing plant layout and process flow, a simulation analysis was conducted using the Plant Simulation platform with the utilization efficiency of each station and production capacity of the dismantling system as indicators. A problem with long-term suspension in the disassembly process was determined. Based on the two optimization directions of increasing material transportation equipment and expanding the buffer capacity, a cost-oriented optimization model is established. A genetic algorithm and model simulation were used to solve the model. An optimization scheme that satisfies the production needs and has the lowest cost is proposed. The results show that the optimized dismantling system solves the suspended work problem at the dismantling station and a significant improvement in productivity and station utilization efficiency compared with the previous system.

Cite

CITATION STYLE

APA

Chen, H. Q., Dong, Y. D., Hu, F., Liu, M. M., & Zhang, S. B. (2023). Simulation and optimization of scrap wagon dismantling system based on Plant Simulation. Visual Computing for Industry, Biomedicine, and Art, 6(1). https://doi.org/10.1186/s42492-023-00134-7

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free