Abstract
This paper discusses the problem of time-constrained job-shop scheduling with technological machine breakdown prediction. The first section gives short characteristics of the field of research, and describes the effects of machine failure on job completion times. Secondly, the discussed problem is represented by means of mathematical equations and solved with original algorithms for machine failure prediction and implementation of redundant service times, and finally, the proposed solutions are verified by means of simulation. In the computational experiment stage a typical production case with taking into account 3 machines failure was considered. The last part of this paper draws conclusions from the study and presents directions of future research work.
Cite
CITATION STYLE
Sobaszek, Ł., Gola, A., & Kozłowski, E. (2018). Job-shop scheduling with machine breakdown prediction under completion time constraint. In Proceedings of the 2018 Federated Conference on Computer Science and Information Systems, FedCSIS 2018 (pp. 437–440). Institute of Electrical and Electronics Engineers Inc. https://doi.org/10.15439/2018F83
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.