PERAWATAN HOIST CRANE DENGAN METODE MAINTAINABILITY DAN COSTING UNTUK MENGURANGI BREAKDOWN

  • Hardianto A
  • Pratikto P
  • Yuliati L
N/ACitations
Citations of this article
40Readers
Mendeley users who have this article in their library.

Abstract

Abstract PT. ABC is a manufacturing company in the field that requires a crane hoist readiness in every production, with an average of 42.92 hours a breakdown, the necessary methods of treatment that effectively and efficiently, with a critical component bearing, gear, wheel trolley, wire rope, shaft, cable pedant. The time interval is the optimum replacement parts NTN Bearing 304; 51 108 21 days, Talibaja (wire rope) Gustav / Demag O16 x 8 x 36 + 1 stainless core38 day, canvass the motor 45, wheel trolley 89 days, gear 76 a day, the pen as 39 days, the cable pendant 67 danUntuk cost savings component replacement Bearing NTN 304; 51 108 Rp. 689,435.94 and pesentase amounted to 3.34%, Talibaja (wire rope) Gustav / Demag O16 x 8 x 36 + 1 stell core Rp. 3,634,660.00 and a percentage of 2.51%, canvass motorcycle is Rp. 7,948,540.37 and a percentage of 58.88%, wheel trolley Rp. 755,467.50 and a percentage of 11.27, gear Rp. 50,195,101.20 and a percentage of 61.68%, the pen as Rp. 18,110,676.40 and the percentage of 62%, amounting to USD 8,545,480.84 pendant cable and a percentage of 38.47%.

Cite

CITATION STYLE

APA

Hardianto, A., Pratikto, P., & Yuliati, L. (2015). PERAWATAN HOIST CRANE DENGAN METODE MAINTAINABILITY DAN COSTING UNTUK MENGURANGI BREAKDOWN. Journal of Engineering and Management Industial System, 3(2). https://doi.org/10.21776/ub.jemis.2015.003.02.10

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free