Abstract
Selected components of the Water Erosion Prediction Project (WEPP) model and the versatile soil moisture budget (VB) were tested on observed data for two study sites in the Peace River region. The version of the WEPP model available estimated snow depth, soil frost depth and frequency of freeze-thaw cycles. However, the results did not adequately match observed data. The VB was modified in this study to improve the estimate of potential winter and spring runoff, and it was shown that incorporating observations of snow depth improved the estimate of the time and amount of snowmelt runoff. The modified runoff model was validated with data collected in the Peace River area of northern Alberta and British Columbia and with published data from the Prairies. -from Authors
Cite
CITATION STYLE
Hayhoe, H. N., Pelletier, R. G., & Van Vliet, L. J. P. (1993). Estimation of snowmelt runoff in the Peace River region using a soil moisture budget. Canadian Journal of Soil Science, 73(4), 489–501. https://doi.org/10.4141/cjss93-050
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.