Critical Risk Factors Affecting Time and Cost in Highway Construction: A Global Systematic Literature Review

3Citations
Citations of this article
61Readers
Mendeley users who have this article in their library.

Abstract

This study presents a systematic literature review of critical risk factors affecting the time and cost performance of highway construction projects. Drawing from 83 peer-reviewed studies across multiple geographic regions, the paper identifies recurrent drivers of project delay and cost overrun in highway construction. The most frequently reported risks include (1) financial constraints, (2) political regulatory issues; (3) land-acquisition and right-of-way delays; (4) design and scope changes; (5) utilities relocation/conflicts; (6) materials and equipment shortages; (7) contractor-related issues; (8) planning and scheduling weaknesses; (9) labour and personnel issues; and (10) weather conditions. These risk factors collectively highlight the importance of robust planning, proactive stakeholder coordination, and the integration of risk-informed decision-making tools. The findings emphasize the need for targeted risk mitigation during early project stages and provide a foundation for refining risk assessment frameworks and future research directions in transport infrastructure development.

Cite

CITATION STYLE

APA

Zhasmukhambetova, A., Evdorides, H., & Davies, R. J. (2025, December 1). Critical Risk Factors Affecting Time and Cost in Highway Construction: A Global Systematic Literature Review. Future Transportation. Multidisciplinary Digital Publishing Institute (MDPI). https://doi.org/10.3390/futuretransp5040192

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free