Key Planning Questions to Consider in Small Stream Hydrometric Monitoring

  • Pike R
  • Goeller N
  • Goetz J
  • et al.
N/ACitations
Citations of this article
10Readers
Mendeley users who have this article in their library.

Abstract

This article provides key questions to consider when planning and operating a small stream hydrometric station. Office planning components include defining hydrometric monitoring objectives; the availability of hydrometric expertise; resource availability; safety plans and standard operating procedures; equipment availability (hydrometric station installation and streamflow measurement); sampling frequency and data availability; permissions and permitting requirements; data processing, access, and archiving; and metadata requirements. Key parts of field-based hydrometric planning include site safety; site accessibility; flow variability; channel control features; flow containment, diversions and additions; low flow considerations; high flow considerations; flow measurement challenges in small streams; benchmarks and survey criteria; and public safety and vandalism. Theoverall  goal of the article is to help non-professionals collect better hydrometric data and to highlight the varied planning aspects of typical hydrometric installations and operations.

Cite

CITATION STYLE

APA

Pike, R., Goeller, N., Goetz, J., & Crookshanks, S. (2019). Key Planning Questions to Consider in Small Stream Hydrometric Monitoring. Confluence: Journal of Watershed Science and Management, 3(2). https://doi.org/10.22230/jwsm.2019v3n2a25

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free