IMPROVING PRODUCTIVITY IN VENTILATION AND PLUMBING INSTALLATIONS BY DEVELOPING DESIGNS

2Citations
Citations of this article
7Readers
Mendeley users who have this article in their library.

Abstract

Quality of designs is one of the most important factors impacting the productivity of mechanical, electrical, and plumbing work. Previous research does not investigate problems with design in detail. This research aimed to identify design aspects where additional investments in design would increase productivity in installation. For this purpose, we selected three construction sites to identify deviations from designs, and interview installers on identified deviations and buildability in general. Observed deviations were divided into three main categories based on the cause of deviation: insufficient space reservations, missing model components, and buildability. Based on our findings we suggest five methods for developing designing: 1. BIM should be used in designing. 2. BIM coordination should include the assessment of buildability. 3. Better use of BIM requires high level of detail and high accuracy in all design models. 4. Contractors knowledge on buildability, schedule, and order of installation should be utilized in designing. 5. Optimizing material cost should be part of designing.

Author supplied keywords

Cite

CITATION STYLE

APA

Valkonen, T., & Seppänen, O. (2023). IMPROVING PRODUCTIVITY IN VENTILATION AND PLUMBING INSTALLATIONS BY DEVELOPING DESIGNS. In Annual Conference of the International Group for Lean Construction, IGLC (Vol. 31, pp. 1061–1071). International Group for Lean Construction. https://doi.org/10.24928/2023/0151

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free