Abstract
PT X is one of Indonesia’s cement companies operating three active plants: Plant IV, V, and VI. Production data from 2022 and 2023 indicate that Plant V achieved only 79% and 86% of its production targets, with high downtime resulting from a reliance on corrective maintenance. This study proposes a preventive maintenance schedule to reduce downtime using the Reliability-Centered Maintenance (RCM) method for controlling critical components and an age-based replacement model for minimizing downtime. The analysis identified eight critical components in Raw Mill Machines 1 and 2, with reliability improvements ranging from 14% to 58%. Implementation of the proposed schedule resulted in increased machine availability by 5.1% and 4.65%, and system reliability improved by 33.71%. These findings demonstrate that RCM-based preventive maintenance effectively enhances operational performance.
Cite
CITATION STYLE
Alfadhlani, A., Zuhair, A., & Fithri, P. (2025). Reliability-Based Preventive Maintenance Scheduling for Raw Mill Equipment to Minimize Downtime at PT X. METAL: Jurnal Sistem Mekanik Dan Termal, 9(2), 146–157. https://doi.org/10.25077/metal.9.2.146-157.2025
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.