BIM application in the operation and maintenance management of a sports infrastructure

11Citations
Citations of this article
106Readers
Mendeley users who have this article in their library.

Abstract

Operation and Maintenance (O&M) stage is the most expensive phase during the life cycle of a building. Currently, much of the information used in there is still paper-based and is delivered to the owner months after the facilities are in use. Therefore, it is necessary to study the interaction between Lean principles and Building Information Modeling(BIM) Functionalities in the building during O&M phase to optimize resources. This paper proposes a BIM-FM workflow and compares it with traditional Facility Management in a Peruvian sports infrastructure. The case study was Aquatic Center for the XVIII Pan-American Games and VI Parapan-American Games Lima 2019. The sport infrastructure was designed and built under an Integrated Project Delivery (IPD) environment applying BIM methodology until the construction phase. The main difference found is that proposed BIM-FM workflow improves the efficiencies of the workforce for accessing to accuracy and complete information about Facility’s components. Finally, the paper presents barriers in the BIM-FM implementation evidenced in the case study.

Cite

CITATION STYLE

APA

Guzman, G., & Ulloa, W. (2020). BIM application in the operation and maintenance management of a sports infrastructure. In IGLC 28 - 28th Annual Conference of the International Group for Lean Construction 2020 (pp. 949–960). The International Group for Lean Construction. https://doi.org/10.24928/2020/0015

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free