A Novel Modeling for Assessing Frequency Behavior during a Hydro-to-Thermal Plant Black Start Restoration Test

30Citations
Citations of this article
12Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

Northern electric grid of Italy was involved in a black start mock drill. This test took place on November 2016 in order to check the coordination and efficiency of all the operational staffs and the automatic regulators involved in the case of a real blackout scenario. This paper presents the results of a research carried out in collaboration with Terna Rete Italia (the Italian Transmission System Operator), in order to find strengths and weaknesses and eventually to upgrade the existing restoration plan. Starting from the measures coming from generating plants and substations bars, the model of frequency regulation system for both the participating hydro and thermal power plants is developed. This work gives the system operator an essential tool to understand many complex dynamics and phenomena occurred during the test. At the same time, a robust model simulating the system behavior with different grid configurations is presented: it gives the opportunity to enhance both the classical power system control theory and the black start practices.

Cite

CITATION STYLE

APA

Benato, R., Bruno, G., Sessa, S. D., Giannuzzi, G. M., Ortolano, L., Pedrazzoli, G., … Zaottini, R. (2019). A Novel Modeling for Assessing Frequency Behavior during a Hydro-to-Thermal Plant Black Start Restoration Test. IEEE Access, 7, 47317–47328. https://doi.org/10.1109/ACCESS.2019.2909321

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free