APLIKASI FUZZY LINEAR PROGRAMMING (FLP) DAN SIMULASI ARENA 10.0 UNTUK MENGOPTIMALKAN PRODUCTION PLANNING

  • Suseno S
  • Al-Faritsy A
N/ACitations
Citations of this article
19Readers
Mendeley users who have this article in their library.

Abstract

Production planning conducted by PT. Tonggak Ampuh Unit III of Yogyakarta is simplifying some of the product into two products namely poles and power lines. Two refers to the product along with the needs of the type and quantity of material and production capacity , then performed the mathematical modeling of a Linear Programming (LP) and Fuzzy Linear Programming ( FLP ) to maximize profits . The research methodology applied in this case is the result of the optimization calculations using Linear Programming (LP) and Fuzzy Linear Programming (FLP) obtained the maximum profit . The maximum profit from both methods were compared and selected the largest to be entered in running simulation using ARENA 10 , if feasible production plan is generated to run on the production floor or not . Optimal production planning model with a model for the production of electric pole FLP many as 242 units and to pile as many as 152 units and the optimal profit is Rp. 329.149.000,-. Keyword

Cite

CITATION STYLE

APA

Suseno, S., & Al-Faritsy, A. Z. (2014). APLIKASI FUZZY LINEAR PROGRAMMING (FLP) DAN SIMULASI ARENA 10.0 UNTUK MENGOPTIMALKAN PRODUCTION PLANNING. J@TI UNDIP : JURNAL TEKNIK INDUSTRI, 9(3). https://doi.org/10.12777/jati.9.3.147-150

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free