Effects of half-precast concrete slab system on construction productivity

25Citations
Citations of this article
91Readers
Mendeley users who have this article in their library.

Abstract

A half-precast concrete slab system (HPCSS) is reported to exhibit excellent structural performance when compared with traditional slab systems. However, there is a lack of extant research examining the construction issues of an HPCSS. Thus, in this study, we analyze the construction process and productivity of applying an HPCSS by using a simulation method with the data collected from an actual construction case. The results indicate that (i) the construction productivity of HPCSS is 1.7 times that of a traditional slab system, (ii) the cost per productivity unit of HPCSS exceeds that of a traditional slab system, and (iii) critical resources affecting the HPCSS productivity include form crew and rebar crew. The results of this study suggest that it is possible to develop an optimal construction plan of a construction site in which an HPCSS is installed, and that the HPCSS can be actively applied in the future.

Cite

CITATION STYLE

APA

Cho, K., Shin, Y. su, & Kim, T. (2017). Effects of half-precast concrete slab system on construction productivity. Sustainability (Switzerland), 9(7). https://doi.org/10.3390/su9071268

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free