Blasting preparation for selective mining of complex structured ore deposition

13Citations
Citations of this article
5Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

Technological features of ore mining in the open pit development for processing of complex structured ore deposit of steeply falling occurrence have been considered. The technological schemes of ore bodies mining under different conditions of occurrence, consistency and capacity have been considered and offered in the paper. These technologies permit to reduce losses and dilution, but to increase the completeness and quality of mined ore. A method of subsequent selective excavation of ore bodies has been proposed. The method is based on the complex use of buffer-blasting technology for the muck mass and the principle of trim blasting at ore-rock junctions.

Cite

CITATION STYLE

APA

Marinin, M. A., & Dolzhikov, V. V. (2017). Blasting preparation for selective mining of complex structured ore deposition. In IOP Conference Series: Earth and Environmental Science (Vol. 87). Institute of Physics Publishing. https://doi.org/10.1088/1755-1315/87/5/052016

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free