Long-term performance of a full-scale membrane plant for landfill leachate pretreatment: A case study

22Citations
Citations of this article
31Readers
Mendeley users who have this article in their library.

Abstract

This paper presents a case study describing a full-scale membrane bioreactor (MBR) for the pretreatment of landfill leachates. The treatment train includes an aerated equalization tank, a denitrification tank, an oxidation/nitrification tank, and two ultrafiltration units. The plant has worked continuously since 2008 treating landfill leachates at a flux of 2–11 L·h−1·m−2. The old train of membranes worked in these conditions for more than seven years prior to being damaged and replaced. The permeability (K) of the membrane varied between 30 and 80 L·h−1·m−2·bar−1 during the years of operation. In 2010, after two years of operation, the oxidation/nitrification tank was changed to work in alternate cycles of aerated and anoxic conditions, in order to improve the denitrification process. The MBR, working at a mean sludge retention time of 144 days and with mixed liquor suspended solids of 17 g/L, achieved high removal rates of conventional contaminants, with more than 98% for Biochemical Oxygen Demand, 96% for ammonium, and 75% for Chemical Oxygen Demand (COD). From the COD balance, half the COD entering was determined to be biologically oxidized into carbon dioxide, while another 24% remains in the sludge. In order to obtain these results, the company used 5.2 KWh·m−3, while spending 0.79 €·m−3.

Cite

CITATION STYLE

APA

Coppini, E., Palli, L., Fibbi, D., & Gori, R. (2018). Long-term performance of a full-scale membrane plant for landfill leachate pretreatment: A case study. Membranes, 8(3). https://doi.org/10.3390/membranes8030052

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free