Abstract
In construction industry, projects are usually completed in a budget more than what is estimated for, finished in a time more than the contracted time, not executed properly according to the specifications, and not constructed with the client satisfaction. The thing that causes lowering the profits of contractors, clients losing, time to market prolonging, and other consequences. Projects execution on or under the budgeted money requires valid practices, precise decisions, good strategies, and needs developing new techniques, such as cost reduction technique. Thus, this paper mainly aims to relieving part of the big concerns of those who specialized in construction media respecting construction cost overruns by determining the most economical structural design, which can be realized by studying, quantifying, analysing cost, and comparing a number of structural elements with different dimensions, different design combinations, and different materials proportions. Then, the optimum structural element, the element that meets the design requirements, comprises the least materials quantities, and costs least, was selected in case to achieve an economical construction.
Cite
CITATION STYLE
Al Kulabi, A. K., & Al Zahid, A. A. (2020). Cost and time reduction of concrete slabs construction by selecting the most economical structural design. In IOP Conference Series: Materials Science and Engineering (Vol. 888). Institute of Physics Publishing. https://doi.org/10.1088/1757-899X/888/1/012016
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.