Scheduling model of construction activity with time couplings

14Citations
Citations of this article
6Readers
Mendeley users who have this article in their library.

Abstract

The algorithm of construction work graphic schedule which takes into account the proper sequencing problem has been presented. The algorithm is described step by step, ie the construction work organisation methods with zero couplings between realisation means. The calculation process of “Limit Possible Minimum” (LPM) taking into account technical and organisation limits is also shown. The second part of the paper includes a practical example which presents the method and the optimisation algorithm for the work organisation method with zero couplings among realisation means. © 2003 Taylor & Francis Group, LLC.

Cite

CITATION STYLE

APA

Hejducki, Z. (2003). Scheduling model of construction activity with time couplings. Journal of Civil Engineering and Management, 9(4), 284–291. https://doi.org/10.1080/13923730.2003.10531341

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free