Forecasting Electricity Load of Network Infrastructure Sharing Mobile Sites in Ghana

1Citations
Citations of this article
3Readers
Mendeley users who have this article in their library.
Get full text

Abstract

The study considered providing the best model among competing models for forecasting electricity load demand. Data from Helios Towers was used for this purpose. The study applied the Autoregressive Integrated Moving Average (ARIMA) model and residuals from the model tested for heteroscedasticity. The residuals were found to be heteroscedastic, thus, the Autoregressive Conditional Heteroscedastic (ARCH) and the Generalized Autoregressive Conditional Heteroscedastic (GARCH) models were applied to the data set. Competing models namely, ARCH (1), ARCH (2), ARCH (3) and GARCH (1, 1) models were fitted to the demand data under study. Based on the Akaike Information Criterion (AIC) and Bayesian Information Criterion (BIC) approach, the best heteroscedastic model was the ARCH (2). The study thus used the ARIMA (3, 0, 4)-ARCH (2) model for a two-point forecast of electricity load demand.

Cite

CITATION STYLE

APA

Oduro-Gyimah, F. K., Boateng, M. A., Abdallah, U., Boateng, K. O., Adjin, D. M. O., & Azasoo, J. Q. (2021). Forecasting Electricity Load of Network Infrastructure Sharing Mobile Sites in Ghana. In Proceedings - 2021 International Conference on Cyber Security and Internet of Things, ICSIoT 2021 (pp. 37–42). Institute of Electrical and Electronics Engineers Inc. https://doi.org/10.1109/ICSIoT55070.2021.00016

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free