Two-stage assembly scheduling with batch setup times, time-dependent deterioration, and preventive maintenance activities using meta-heuristic algorithms

2Citations
Citations of this article
7Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

This article considers a two-stage assembly scheduling problem (TSASP) with batch setup times, time-dependent deterioration, and preventive maintenance activities (PMAs). The objective of this problem is to simultaneously determine the optimal component-manufacturing sequence (CMS), product-assembly sequence (PAS), number of setups, and number and position of PMAs (PPMA). First, to determine the optimal solution, a novel mixed integer linear programming model (MILP) for the proposed problem is derived. Then, a standard genetic algorithm (SGA), hybrid genetic algorithm (HGA), standard harmony search (SHS), hybrid harmony search (HHS), and harmony-search-based evolutionary algorithm (HSEA) were proposed owing to the intractability of the optimal solution for large-scale problems. SGA and SHS provide a chromosome to represent a complete solution including three decisions (CMS, PAS, and PPMA). HGA, HHS, and HSEA provide a chromosome to represent a partial solution including PAS. CMS and PPMA are found by an effective local search heuristic based on the partial solution. A computational experiment is then conducted to evaluate the impacts of the factors on the performance of the proposed algorithms.

Cite

CITATION STYLE

APA

Jung, S., Woo, Y. B., Koh, S., & Kim, B. S. (2018). Two-stage assembly scheduling with batch setup times, time-dependent deterioration, and preventive maintenance activities using meta-heuristic algorithms. Mathematical Problems in Engineering, 2018. https://doi.org/10.1155/2018/6982631

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free