Long-Term Load Forecasting of Southern Governorates of Jordan Distribution Electric System

  • Arfoa A
N/ACitations
Citations of this article
8Readers
Mendeley users who have this article in their library.

Abstract

Load forecasting is vitally important for electric industry in the deregulated economy. This paper aims to face the power crisis and to achieve energy security in Jordan. Our participation is localized in the southern parts of Jordan including, Ma’an, Karak and Aqaba. The available statistical data about the load of southern part of Jordan are supplied by electricity Distribution Company. Mathematical and statistical methods attempted to forecast future demand by determining trends of past results and use the trends to extrapolate the curve demand in the future.

Cite

CITATION STYLE

APA

Arfoa, A. A. (2015). Long-Term Load Forecasting of Southern Governorates of Jordan Distribution Electric System. Energy and Power Engineering, 07(05), 242–253. https://doi.org/10.4236/epe.2015.75023

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free