Seismic-While-Drilling in Kuwait Results and Applications

4Citations
Citations of this article
16Readers
Mendeley users who have this article in their library.

Abstract

During early 1994, Kuwait Oil Company and Schlumberger completed an extensive study of the Seismic-While-Drilling technique in two development wells in the Raudhatain field of North Kuwait. Seismic-While-Drilling records the energy radiated from a working drillbit (utilized as a seismic source), with receivers placed at the surface. This technology provides well seismic information such as checkshot and look ahead Vertical Seismic Profiling services at the wellsite, in real-time. The technique does not interfere with the drilling process nor does it require deploying any downhole hardware. The result of the study is that the Seismic-While-Drilling technique can work successfully in the Raudhatain field.

Cite

CITATION STYLE

APA

Khaled, O. S., Al-Ateeqi, A. M., James, A. R., & Meehan, R. J. (1996). Seismic-While-Drilling in Kuwait Results and Applications. In GeoArabia (Vol. 1, pp. 531–550). Gulf Petrolink. https://doi.org/10.2113/geoarabia0104531

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free