Uncertainty management in time estimation of construction projects: A systematic literature review and new model development

9Citations
Citations of this article
78Readers
Mendeley users who have this article in their library.

Abstract

Nowadays, the very low reliability of project planning in certainty-based approaches has led to the use of more intelligent methods for uncertainty management in construction projects. This systematic study aims to survey the methods which have been used to manage the uncertainties in time estimation of construction projects. A series of steps were undertaken during the review. The study was started with determining the purpose, selecting appropriate keywords, and reducing the selected papers using some criteria. A deeper analysis was carried out on the final paper that met the criteria for this review. The study was limited solely to papers referred to in six top online databases. It aimed to review how the papers had been distributed by a period of publishing, country, and the domains that the methods had been applied for. The result confirmed that uncertainties which afiected any project were controlled by Risk Management and Fuzzy Logic based on probability and possibility theories. Finally, a hybrid method for uncertainty management in project scheduling was proposed. The result of the implementation of this method in the construction project of Iranian Gas Company showed that the proposed method increased the accuracy of time estimation by about 8 to 24 percent.

References Powered by Scopus

Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge

278Citations
N/AReaders
Get full text

Fuzzy critical chain method for project scheduling under resource constraints and uncertainty

181Citations
N/AReaders
Get full text

Fuzzy Monte Carlo simulation and risk assessment in construction

176Citations
N/AReaders
Get full text

Cited by Powered by Scopus

Risk Assessment in Bridge Construction Projects in Iran Using Monte Carlo Simulation Technique

32Citations
N/AReaders
Get full text

Imprecise earned duration model for time evaluation of construction projects with risk considerations

28Citations
N/AReaders
Get full text

Adoption of Sustainable Supply Chain Management for Performance Improvement in the Construction Industry: A System Dynamics Approach

15Citations
N/AReaders
Get full text

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Cite

CITATION STYLE

APA

Naderpour, A., Sardroud, J. M., Mofid, M., Xenidis, Y., & Rostam, T. P. (2019). Uncertainty management in time estimation of construction projects: A systematic literature review and new model development. Scientia Iranica, 26(2), 752–778. https://doi.org/10.24200/sci.2017.4605

Readers over time

‘18‘19‘20‘21‘22‘23‘24‘2506121824

Readers' Seniority

Tooltip

PhD / Post grad / Masters / Doc 23

64%

Lecturer / Post doc 5

14%

Researcher 5

14%

Professor / Associate Prof. 3

8%

Readers' Discipline

Tooltip

Engineering 28

74%

Business, Management and Accounting 7

18%

Computer Science 2

5%

Energy 1

3%

Save time finding and organizing research with Mendeley

Sign up for free
0