A Novel Imperialist Competitive Algorithm to Solve Flexible Flow Shop Scheduling Problem in Order to Minimize Maximum Completion Time

  • Attar S
  • Mohammadi M
  • R.Tavakkoli-Moghaddam A
N/ACitations
Citations of this article
12Readers
Mendeley users who have this article in their library.

Abstract

This paper demonstrates solving the flexible flow shop scheduling problem (FFSP) with considering limited waiting time constraint, sequence dependent setup times and different ready time to minimize maximum completion time (i.e. makespan). Since the problem studied is NP-hard, metaheuristic algorithms are proper to solve this class of problems. Hence, in this paper, a novel imperialist competitive algorithm (ICA) is proposed to tackle of addressed problem. In order to achieve the reliable results in our proposed algorithm, a comprehensive tuning is performed using Taguchi method. to validate this proposed algorithm, the other popular algorithm namely simulated annealing is developed for this goal. Simulation results indicated that ICA is superior to SA.

Cite

CITATION STYLE

APA

Attar, S. F., Mohammadi, M., & R.Tavakkoli-Moghaddam, A. (2011). A Novel Imperialist Competitive Algorithm to Solve Flexible Flow Shop Scheduling Problem in Order to Minimize Maximum Completion Time. International Journal of Computer Applications, 28(10), 27–32. https://doi.org/10.5120/3426-4781

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free