Abstract
In this paper, a backward approach is proposed for maximizing net present value (NPV) in multi-mode resource constrained project scheduling problem while assuming discounted positive cash flows (MRCPSP-DCF). The progress payment method is used and all resources are considered as pre-emptible. The proposed approach maximizes NPV using unscheduled resources through resource calendar in backward mode. For this purpose, a Genetic Algorithm is applied to solve experimental cases with 50 variables and the results are compared with forward serial programming method. The remarkable results reveal that the backward approach is an effective way to maximize NPV in MRCPSP-DC while activity splitting is allowed. The algorithm is flexible enough to be used in real project.
Author supplied keywords
Cite
CITATION STYLE
Delgoshaei, A., Hanjani, S. E., & Nasiri, A. H. (2019). A genetic algorithm for scheduling multimode resource-constrained project problem in the presence of preemptive resources. Journal of Project Management (Canada), 4(3), 195–212. https://doi.org/10.5267/j.jpm.2019.3.005
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.