Electricity generation from biogas on swine farm considering the regulation of distributed energy generation in Brazil: A case study for Minas Gerais

3Citations
Citations of this article
23Readers
Mendeley users who have this article in their library.

Abstract

The objective of this study was to analyze the feasibility of using agricultural waste from a swine farm to produce biogas, which can be used to generate electricity. For this purpose, the waste production potential was evaluated to determine the biogas production capacity of the farm. This measurement allowed scaling the size of the generator used to the electricity production to meet the needs of the farm as well as surplus electricity. The surplus electricity may be used on the farm when the generator is under maintenance or the electricity consumption is larger than the energy generated. This process is regulated by Normative Resolutions 482 and 687 in Brazil. The results of the analysis of the net present value, internal return rate, payback period and benefit cost ratio indicated that the project was feasible.

Cite

CITATION STYLE

APA

Antônio, A. da S., Filho, D. O., & da Silva, S. C. (2018). Electricity generation from biogas on swine farm considering the regulation of distributed energy generation in Brazil: A case study for Minas Gerais. Engenharia Agricola, 38(4), 518–525. https://doi.org/10.1590/1809-4430-Eng.Agric.v38n4p518-525/2018

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free