Abstract
Graphical abstract Abstract Oil and natural gas is one of the needs that must be met by every country. Indonesia is an oil and gas producing country but has not been able to meet national oil needs, so the government has to import to meet oil fuel needs, as in 2010 oil imports reached 64 thousand kilo liters per day. As time goes by, the production of oil and natural gas will decrease due to some wells becoming older or (mature fields) and when the reservoir pressure becomes lower, this will result in a decrease in the production capacity of the formation. The pressure and depth of the well greatly influence the resulting petroleum production. Apart from that, the life cycle of the well is also very important to pay attention to in order to get a lot of petroleum. Based on observations on 28 wells, including well X experienced a decrease in production. For this reason, the solution to optimally increase the rate of oil production is to use the installation of an artificial lift. The method used to calculate the production flow rate in well The results of Vogel's IPR curve analysis on well. Abstrak Minyak dan gas bumi merupakan salah satu kebutuhan yang harus dipenuhi oleh setiap Negara. Indonesia merupakan negara penghasil minyak dan gas bumi namun belum mampu memenuhi kebutuhan minyak nasional, sehingga pemerintah harus mengimpor untuk mencukupi kebutuhan bahan bakar minyak, seperti pada tahun 2010 impor minyak mencapai 64 ribu kilo liter perharinya. Seiring berjalannya waktu produksi minyak dan gas bumi yang dihasilkan akan menurun disebabkan beberapa sumur yang semakin tua atau (mature field) dan ketika tekanan reservoir akan semakin rendah maka mengakibatkan menurunnya kapasitas produksi formasi. Tekanan dan kedalaman sumur sangat berpengaruh terhadap produksi minyak bumi yang dihasilkan. Selain itu siklus hidup sumur juga sangat penting diperhatikan untuk mendapatkan minyak bumi yang banyak. Berdasarkan observasi pada 28 sumur diantaranya sumur X mengalami penurunan jumlah produksi. Untuk itu solusi agar meningkatkan laju produksi minyak secara optimal dilakukan dengan menggunakan pemasangan artificial lift. Metode yang digunakan untuk menghitung laju alir produksi pada sumur X adalah kurva IPR 2 fasa metode vogel dan menentukan jenis electrical submersible pump menggunakan skenario perencanaan artificial lift. Hasil analisis kurva IPR vogel pada sumur X didapatkan laju alir produksi (qmaks) 223.172 bfpd dengan Water Cut Sebesar 72%. Kata kunci: minyak bumi, sumur produksi, artificial lift, metode vogel.
Cite
CITATION STYLE
Bundang, S. (2023). EVALUASI LAJU PRODUKSI MINYAK PADA SUMUR X STUDY PADA PT. CITIC SERAM ENERGY LIMITED, KABUPATEN SERAM BAGIAN TIMUR, PROVINSI MALUKU. Journal Of Science and Engineering, 6(2). https://doi.org/10.33387/josae.v6i2.7006
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.