Analisis Perkiraan Tingkat Pelayanan Jalan (Studi Kasus Rencana Tol Dalam Kota Jakarta Ruas Bekasi Raya)

  • Novitasari N
  • Sudibyo T
N/ACitations
Citations of this article
98Readers
Mendeley users who have this article in their library.

Abstract

In 2017, Jakarta was ranked as 7th most congested city in the world. To overcome the problem of congestion in Jakarta, the government implements the construction of road infrastructure through 6 toll roads inside Jakarta City, but the construction causes pros and contra regarding the effects of induced demand. This research aimed to analyze the service level of Bekasi Raya road on existing and toll roads in Jakarta City and analyzing Bekasi Raya road performance after the operation of the toll road and the off- ramp impact of toll road. The analysis was conducted based on Indonesian Road Capacity Manual 1997, the Greenshield model, and the Highway Capacity Manual 2000. The result showed that the level of road service in segment 1 was C for Bekasi and D for the Pulogadung direction. In segment 2 the level of service was E for both directions, and in segment 3 the level of service was C. The level of the toll road service was C for both directions. The toll roads construction would increase the level of road service to C and reduce vehicle volume of 64.1% in Bekasi direction and 45.2% for Pulogadung (Jakarta) direction. The off-ramp impact was the the toll road would not experience significant congestion until 2035.

Cite

CITATION STYLE

APA

Novitasari, N., & Sudibyo, T. (2020). Analisis Perkiraan Tingkat Pelayanan Jalan (Studi Kasus Rencana Tol Dalam Kota Jakarta Ruas Bekasi Raya). Jurnal Teknik Sipil Dan Lingkungan, 5(1), 1–16. https://doi.org/10.29244/jsil.5.1.1-16

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free