The effect of pre-engineering on design management methods

1Citations
Citations of this article
38Readers
Mendeley users who have this article in their library.

Abstract

Several methods exist for design management such as Agile project management, the Last Planner System®, and configuration in diverse variants. Construction can be realized using different degrees of pre-engineering i.e. different production strategies, which can affect the design management method. The research aim is to describe different design management methods and discuss their capacity to function in existing production strategies in construction. Data was collected as secondary data from earlier publications on Agile project management, the Last Planner® system, configuration, and visual planning. Agile project management has a strong focus on customer value and lends itself well to situations with little pre-engineering. The Last Planner System® in design has a strong focus on the co-creation of flow and coordination of actions. In industrialised housing a dialect of Last Planner System® named KI-VP is implemented drawing upon predefinition of design tasks through standardized work. Configuration is the ultimate predefined design stage, where everything can be automated based on product variants.

Cite

CITATION STYLE

APA

Lidelöw, H., & Jansson, G. (2017). The effect of pre-engineering on design management methods. In IGLC 2017 - Proceedings of the 25th Annual Conference of the International Group for Lean Construction (pp. 523–530). The International Group for Lean Construction. https://doi.org/10.24928/2017/0107

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free