Improving Overall Equipment Effectiveness Using CPM and MOST: A Case Study of an Indonesian Pharmaceutical Company

3Citations
Citations of this article
18Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

This paper discusses the results of a research conducted on the production process of an Indonesian pharmaceutical company. The company is experiencing low performance in the Overall Equipment Effectiveness (OEE) metric. The OEE of the company machines are below world class standard. The machine that has the lowest OEE is the filler machine. Through observation and analysis, it is found that the cleaning process of the filler machine consumes significant amount of time. The long duration of the cleaning process happens because there is no structured division of jobs between cleaning operators, differences in operators' ability, and operators' inability in utilizing available cleaning equipment. The company needs to improve the cleaning process. Therefore, Critical Path Method (CPM) analysis is conducted to find out what activities are critical in order to shorten and simplify the cleaning process in the division of tasks. Afterwards, The Maynard Operation and Sequence Technique (MOST) method is used to reduce ineffective movement and specify the cleaning process standard time. From CPM and MOST, it is obtained the shortest time of the cleaning process is 1 hour 28 minutes and the standard time is 1 hour 38.826 minutes.

Cite

CITATION STYLE

APA

Omega, D., & Andika, A. (2017). Improving Overall Equipment Effectiveness Using CPM and MOST: A Case Study of an Indonesian Pharmaceutical Company. In IOP Conference Series: Earth and Environmental Science (Vol. 101). Institute of Physics Publishing. https://doi.org/10.1088/1755-1315/101/1/012039

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free