PLANNING OF PHOTOVOLTAIC AND PLN HYBRID SYSTEM IN BANGKA BELITUNG UNIVERSITY

  • Sunanda W
  • Siregar M
  • Putra G
N/ACitations
Citations of this article
5Readers
Mendeley users who have this article in their library.

Abstract

Electricity at Universitas Bangka Belitung is currently supplied by the Bangka Belitung Region PLN with a power supply of 690 kVA to meet electrical energy needs. This study analyzes the hybrid photovoltaic-PLN pattern in UBB to find out more economical systems. The calculation result of the more economical hybrid pattern is the pattern with the distribution of PLN's load of 70% -30% PLTS which results in a Net Present Cost (NPC) value of US $ 1,071 M and a Cost Of Energy (COE) of US $  0.107.

Cite

CITATION STYLE

APA

Sunanda, W., Siregar, M. A. R., & Putra, G. B. (2019). PLANNING OF PHOTOVOLTAIC AND PLN HYBRID SYSTEM IN BANGKA BELITUNG UNIVERSITY. Jurnal Ecotipe (Electronic, Control, Telecommunication, Information, and Power Engineering), 6(2), 56–60. https://doi.org/10.33019/ecotipe.v6i2.1082

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free