Electricity at Universitas Bangka Belitung is currently supplied by the Bangka Belitung Region PLN with a power supply of 690 kVA to meet electrical energy needs. This study analyzes the hybrid photovoltaic-PLN pattern in UBB to find out more economical systems. The calculation result of the more economical hybrid pattern is the pattern with the distribution of PLN's load of 70% -30% PLTS which results in a Net Present Cost (NPC) value of US $ 1,071 M and a Cost Of Energy (COE) of US $ 0.107.
CITATION STYLE
Sunanda, W., Siregar, M. A. R., & Putra, G. B. (2019). PLANNING OF PHOTOVOLTAIC AND PLN HYBRID SYSTEM IN BANGKA BELITUNG UNIVERSITY. Jurnal Ecotipe (Electronic, Control, Telecommunication, Information, and Power Engineering), 6(2), 56–60. https://doi.org/10.33019/ecotipe.v6i2.1082
Mendeley helps you to discover research relevant for your work.