PLANNING OF PHOTOVOLTAIC AND PLN HYBRID SYSTEM IN BANGKA BELITUNG UNIVERSITY

  • Siregar M
  • Sunanda W
  • Putra G
N/ACitations
Citations of this article
5Readers
Mendeley users who have this article in their library.

Abstract

Electricity at Universitas Bangka Belitung is currently supplied by the Bangka Belitung Region PLN with a power supply of 690 kVA to meet electrical energy needs. This study analyzes the hybrid photovoltaic-PLN pattern in UBB to find out more economical systems. The calculation result of the more economical hybrid pattern is the pattern with the distribution of PLN's load of 70% -30% PLTS which results in a Net Present Cost (NPC) value of US $ 1,071 M and a Cost Of Energy (COE) of US $  0.107.Energi listrik Universitas Bangka Belitung saat ini dipasok oleh PLN Wilayah Bangka Belitung dengan pasokan daya 690 kVA untuk memenuhi kebutuhan energi listrik. Penelitian ini melakukan analisis pola hybrid photovoltaic-PLN di UBB untuk mengetahui sistem yang lebih ekonomis . Hasil perhitungan menujukan pola hybrid yang lebih ekonomis adalah pola dengan pembagian beban PLN 70%-30%PLTS yang menghasilkan nilai Net Present Cost(NPC) sebesar US$ 1.071 M dan Cost Of Energy(COE) sebesar US $ 0.107

Cite

CITATION STYLE

APA

Siregar, M. A. R., Sunanda, W., & Putra, G. B. (2019). PLANNING OF PHOTOVOLTAIC AND PLN HYBRID SYSTEM IN BANGKA BELITUNG UNIVERSITY. Jurnal Ecotipe (Electronic, Control, Telecommunication, Information, and Power Engineering), 6(2), 56–60. https://doi.org/10.33019/ecotipe.v6i2.1082

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free