Abstract
Planning optimization considering various uncertainties has attracted increasing attention in the process industry. In existing studies, the uncertainty is often described with a time-invariant distribution function during the entire planning horizon, which is a questionable assumption. In particular, for long-term planning problems, the uncertainty tends to vary with time, and it usually increases when a model is used to predict the parameter (e.g., price) far into the future. In this paper, time-varying uncertainties are considered in robust planning problems with a focus on a poly(vinyl chloride) (PVC) production planning problem. Using the stochastic programming techniques, a stochastic model is formulated and then transformed into a multiperiod mixed-integer linear programming model by chance-constrained programming and piecewise linear approximation. The proposed approach is demonstrated on industrial-scale cases originating from a real-world PVC plant. The comparisons show that the model considering varying uncertainty is superior in terms of robustness under uncertainties.
Cite
CITATION STYLE
Gao, X., Wang, Y., Feng, Z., Huang, D., & Chen, T. (2018). Plant Planning Optimization under Time-Varying Uncertainty: Case Study on a Poly(vinyl chloride) Plant. Industrial and Engineering Chemistry Research, 57(36), 12182–12191. https://doi.org/10.1021/acs.iecr.8b02101
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.