Abstract
The augmented electricity demand requires electrical infrastructure upgrades with system operators instituting strategies to increase Distribution Network (DN) capacity in tandem with load growth. In this study, a simple method of deploying Li-ion Battery Energy Storage Systems (BESSs) to defer DN upgrades is presented by utilizing historical load profiles. The k-means algorithm is employed to cluster the annual load profiles obtained from a substation in groups of 15-minute intervals. The load data are min-max scaled and fed as input to the K-means algorithm. The NPV financial analysis method is followed in the DN upgrade deferral benefit determination with the acquired benefit depending on Li-ion BESS price and feeder upgrade cost. The results indicate economic viability of up to four years with a Net Present Value (NPV) of US$10k for Li-ion 2000kW/3000kWh BESS. More benefits and deferral years are achieved by varying Li-ion BESS and feeder upgrade costs to 80% and 120%, respectively with deferral years increased to six with an NPV of US$110k for Li-ion BESS of 3100kW/6000kWh.
Author supplied keywords
Cite
CITATION STYLE
Ondigo, E., & Wekesa, C. (2024). Economic Viability of Distribution Network Upgrade Deferral through BESS Sizing from K-Means Clustered Annual Load Profile Data. Engineering, Technology and Applied Science Research, 14(3), 14517–14524. https://doi.org/10.48084/etasr.7189
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.