Analisis Kinerja Alat Berat Pada Proyek Normalisasi dan Perkuatan Tebing Sungai

  • Jaya A
  • Lakawa I
  • Hawa S
  • et al.
N/ACitations
Citations of this article
45Readers
Mendeley users who have this article in their library.

Abstract

The purpose of this study was to analyze the performance of heavy equipment and the duration of time required to complete the Windo River Cliff Normalization and Reinforcement Project, Pamandati Village, Laeya District, South Konawe Regency. The results showed that the excavator's performance in excavation work (mechanical) was 38.68 m3/hour, dump truck 2.99 m3/hour. As for the embankment work imported from outside, the performance of the excavator is 98.53 m3/hour and the dump truck is 3.05 m3/hour. Where the duration of time required to complete the excavation work (mechanical) with an excavator is 12 days and for embankment work imported from outside is 2 days..

Cite

CITATION STYLE

APA

Jaya, A., Lakawa, I., Hawa, S., & Bona, M. S. (2022). Analisis Kinerja Alat Berat Pada Proyek Normalisasi dan Perkuatan Tebing Sungai. Sultra Civil Engineering Journal, 3(1), 1–8. https://doi.org/10.54297/sciej.v3i1.239

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free