Two stage flow shop scheduling model including transportation time with equipotential machines at every stage

1Citations
Citations of this article
4Readers
Mendeley users who have this article in their library.
Get full text

Abstract

This study presents a solution algorithm for the problem of minimizing the makespan on equipotential parallel machines at every stage in two stage flow shop scheduling model. The processing time of all the jobs on all the two machines is given and the time for which parallel equipotential machines are available is also given. Transportation time for moving the jobs from first machine to second machine is also taken into consideration. A mathematical illustration is also given in support of the algorithm proposed.

Cite

CITATION STYLE

APA

Gupta, D., & Goel, S. (2019). Two stage flow shop scheduling model including transportation time with equipotential machines at every stage. International Journal of Innovative Technology and Exploring Engineering, 8(12), 5090–5094. https://doi.org/10.35940/ijitee.L2740.1081219

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free