A rolling prediction optimization strategy for the optimal design of grid connected integrated CCHP system with renewable energy and energy storage

0Citations
Citations of this article
8Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

Integrated Combined Cooling Heating and Power (CCHP) system with renewable energy (RE) and energy storage (ES), short as RE-CCHP-ES, is the distributed power station supply electricity, heating, cooling, and hot water by solar, wind power, and natural gas for a specific customer, such as campus, hospital, or commercial palace. Following electric load (FEL) and following the thermal load (FTL) are the traditional operation strategies for CCHP system. But for the system with gas boiler and electricity storage, their performances are not satisfied. Therefore, FLB-RPO operation strategy is designed and contracted with FEL-ECR, and FLB. The result of case study shows that the system designed under FLB-RPO strategy reducing more carbon emission, energy consumption, and system cost than the systems designed under other operation strategy or power supply.

Cite

CITATION STYLE

APA

Li, H., Zhang, C., Sun, B., & Li, Y. (2019). A rolling prediction optimization strategy for the optimal design of grid connected integrated CCHP system with renewable energy and energy storage. In IOP Conference Series: Earth and Environmental Science (Vol. 227). Institute of Physics Publishing. https://doi.org/10.1088/1755-1315/227/4/042057

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free