Abstract
The project influence curve postulates that planning efforts conducted early in a project can influence project success more than later efforts. Although front-end planning has been shown to influence project performance, the impact of involving the contractor in design–build (DB) of highway projects starting at different points of percent base design has not been tested empirically. This paper reports on a study of 31 DB highway projects with base design ranging from 10% to 95%. This research is significant because it empirically tests whether initial award performance is enhanced at lower percent base design as implied by the project influence curve. The F-statistic indicates that, for this set of DB highway projects, years of agency DB experience is significantly related to initial award performance, while percent base design is not. This research addresses the misconception held by many transportation agencies that procuring a DB entity with lower percent base design will result i)
Cite
CITATION STYLE
Papajohn, D., & El Asmar, M. (2020). Percent Base Design and Initial Award Performance in Design–Build Highway Projects. Journal of Management in Engineering, 36(3). https://doi.org/10.1061/(asce)me.1943-5479.0000759
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.