Preliminary analysis on decommissioning strategies for fukushima daiichi nuclear power station from waste management perspective

0Citations
Citations of this article
8Readers
Mendeley users who have this article in their library.
Get full text

Abstract

In this study, basic strategies for the decommissioning and site remediation of the Fukushima Daiichi Nuclear Power Station (FDNPS) were investigated. Six scenarios were formulated based on two of the three decommissioning strategies of nuclear power plants defined by the International Atomic Energy Agency (IAEA): immediate dismantling and deferred disman-tling. A multicriteria decision analysis was performed to analyze the preferences of the options from the viewpoints of the timeframe to complete decommissioning, the resulting waste, the site usability, and the availability of the radioactive waste disposal route. The same six scenarios were applied to both the FDNPS and the nuclear power plants that ceased operation after a normal plant life cycle for comparison. For the FDNPS, the decommissioning project involved fuel debris retrieval, dismantling, and site remediation. The analysis results suggest that the balance between the amount of waste and the time to achieve the end state may be one of the most critical factors to consider when planning the decommissioning and site remediation of the FDNPS.

Cite

CITATION STYLE

APA

Watanabe, N., & Yanagihara, S. (2021). Preliminary analysis on decommissioning strategies for fukushima daiichi nuclear power station from waste management perspective. Journal of Nuclear Fuel Cycle and Waste Technology, 19(3), 297–306. https://doi.org/10.7733/jnfcwt.2021.19.3.297

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free