An Integrated Production-Distribution Planning Problem under Demand and Production Capacity Uncertainties: New Formulation and Case Study

15Citations
Citations of this article
52Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

In this study, we propose to solve a biobjective tactical integrated production-distribution planning problem for a multisite, multiperiod, multiproduct, sea-air intermodal supply chain network under uncertainties. Two random parameters are considered simultaneously: product replenishment orders and production capacity, which are modelled via a finite set of scenarios, using a two-stage stochastic approach. A corresponding mathematical model is developed, coded, and solved using the LINGO 18.0 software optimisation tool. This model aims to simultaneously minimise the total costs of production in both regular and overtime, inventory, distribution, and backordering activities and maximise the customer satisfaction level over the tactical planning horizon. The AUGMECON technique is applied to handle with the multiobjective optimisation. The applicability and the performance of the proposed model are tested through a real-life case study inspired from a medium-sized Tunisian textile and apparel company. Sensitivity analysis on stochastic parameters and managerial insights for the studied supply chain network are argued based on the empirical findings.

Cite

CITATION STYLE

APA

Ben Abid, T., Ayadi, O., & Masmoudi, F. (2020). An Integrated Production-Distribution Planning Problem under Demand and Production Capacity Uncertainties: New Formulation and Case Study. Mathematical Problems in Engineering, 2020. https://doi.org/10.1155/2020/1520764

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free