Scheduling Construction Processes Using the Probabilistic Time Coupling Method III

5Citations
Citations of this article
6Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

The paper presents modelling of construction project schedules using new method: Probabilistic Time Coupling Method III (PTCM III). It is presented in EXCEL application with a description of the calculation scheme. The correctness of the PTCM method was checked by comparison with the results obtained for the same data in the Risky Project Professional (RPP) program. As a result of the analysis, it was found that the PTCM III method is the closest to the RPP, taking into account the beta distribution of the probability of times. Mean absolute percentage error (MAPE) is less than 1%, so it can be assumed that the matching of these two calculation methods is excellent.

Cite

CITATION STYLE

APA

Kostrzewa, P., & Rogalska, M. (2019). Scheduling Construction Processes Using the Probabilistic Time Coupling Method III. In IOP Conference Series: Materials Science and Engineering (Vol. 471). Institute of Physics Publishing. https://doi.org/10.1088/1757-899X/471/11/112072

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free