Design, integration and operation of a rotating combustor-turbine-interaction test rig within the scope of EC FP7 project factor

25Citations
Citations of this article
11Readers
Mendeley users who have this article in their library.

Abstract

Following the industrial trend of increasingly integrative design and analysis of the combustor-turbine interface, the EC FP7 project FACTOR was launched many years ago. The project ended in late 2017 after successful completion of the experimental test campaign involving blank-sheet design rotating turbine rig hardware, which was assembled, integrated and operated in DLR's turbine test facility NG-Turb in Göttingen, Germany. This paper highlights the DLR contribution to FACTOR including the 1.5 stage turbine rig's mechanical design, instrumentation and integration as well as final part assembly to a working rig. Additionally, DLR was responsible for rig operation and overall measurement campaign fulfilment including the acquisition of static pressure and temperature data as well as aerothermal 5-hole-probe traverses in different measurement planes. The implemented combustor simulator created a characteristic flow profile to and through the turbine with strongly varying flow angles and temperatures, that posed a challenge for the applied measurement techniques.

Cite

CITATION STYLE

APA

Krumme, A., Tegeler, M., & Gattermann, S. (2019). Design, integration and operation of a rotating combustor-turbine-interaction test rig within the scope of EC FP7 project factor. In European Conference on Turbomachinery Fluid Dynamics and Thermodynamics, ETC. https://doi.org/10.29008/etc2019-035

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free