Fermilab main injector: High intensity operation and beam loss control

26Citations
Citations of this article
5Readers
Mendeley users who have this article in their library.

Abstract

From 2005 through 2012, the Fermilab Main Injector provided intense beams of 120 GeV protons to produce neutrino beams and antiprotons. Hardware improvements in conjunction with improved diagnostics allowed the system to reach sustained operation at 400 kW beam power. Transmission was very high except for beam lost at or near the 8 GeV injection energy where 95% beam transmission results in about 1.5 kW of beam loss. By minimizing and localizing loss, residual radiation levels fell while beam power was doubled. Lost beam was directed to either the collimation system or to the beam abort. Critical apertures were increased while improved instrumentation allowed optimal use of available apertures. We will summarize the improvements required to achieve high intensity, the impact of various loss control tools and the status and trends in residual radiation in the Main Injector.

Cite

CITATION STYLE

APA

Brown, B. C., Adamson, P., Capista, D., Chou, W., Kourbanis, I., Morris, D. K., … Yang, M. J. (2013). Fermilab main injector: High intensity operation and beam loss control. Physical Review Special Topics - Accelerators and Beams, 16(7). https://doi.org/10.1103/PhysRevSTAB.16.071001

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free