Textile industry, which is one of the most prominent industries in Indonesia, faces a problem caused by the condition of machine productions. This situation leads to a need of good machine scheduling system. Generally, production processes in textile industry belong to the flow shop scheduling problems (FSSP). Many approaches/heuristics have been proposed for solving FSSP. Two of them are Palmer's algorithm and Gupta's algorithm. This paper investigates a method, called genetic algorithm hyper-heuristic, for combining those heuristics in order to obtain some new better heuristics. This method is then implemented in a framework.
CITATION STYLE
E. Nugraheni, C., & Abednego, L. (2016). On the Development of Hyper Heuristics Based Framework for Scheduling Problems in Textile Industry. International Journal of Modeling and Optimization, 6(5), 272–276. https://doi.org/10.7763/ijmo.2016.v6.539
Mendeley helps you to discover research relevant for your work.