Effect of Change in Mixing Time of Mixer on Wet Density, Dry Density, Workability and Compressive Strength of M-20 Grade Concrete

  • M. B. Varma
N/ACitations
Citations of this article
16Readers
Mendeley users who have this article in their library.

Abstract

on actual construction site at the time of concrete production, mixing time of concrete mixer is kept as 2 minutes. This study was carried out on concrete properties by changing its mixing time. Ten concrete samples were prepared and tested with mixing time of mixture 1 minute, 2 minutes, and 3 minutes up to 10 minutes. Concrete of M-20 grade was prepared as per IS 456-2000. Using Nominal mix (guide lines of IS 456-2000) concrete was manufactured. Wet and dry density, workability and compressive strength were recorded for ten concrete mixes. Results obtained were presented in this paper.

Cite

CITATION STYLE

APA

M. B. Varma. (2016). Effect of Change in Mixing Time of Mixer on Wet Density, Dry Density, Workability and Compressive Strength of M-20 Grade Concrete. International Journal of Engineering Research And, V5(12). https://doi.org/10.17577/ijertv5is120115

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free