Moth Flame Optimization based Reactive Power Planning

  • et al.
N/ACitations
Citations of this article
4Readers
Mendeley users who have this article in their library.
Get full text

Abstract

Reactive power planning is one of the challenges facing an integrated power network to operate efficiently. It requires optimal coordination of all the reactive power sources in the network. In this work, Moth flame optimization (MFO) based algorithm used for optimal location of flexible alternating current transmission system (FACTS) devices. In standard IEEE 30 and IEEE 57 test systems the proposed approach is examined. The static Var compensator (SVC) and thyristor controlled series capacitor (TCSC) are the two FACTS devices used. The load ability of the power system is enhanced by installing FACTS controllers considering both active and reactive loading. The reactive sources are placed optimally which is chosen by considering position and size of FACTS devices. The proposed method with FACTS devices is compared with other recent techniques like Particle swarm optimization (PSO) and gravitational search algorithm (GSA). It is observed that the MFO based approach is better as compared to other methods in terms of loss and the running cost at various loading conditions.

Cite

CITATION STYLE

APA

Kar*, M. K., Kumar, S., & Singh, A. K. (2020). Moth Flame Optimization based Reactive Power Planning. International Journal of Innovative Technology and Exploring Engineering, 9(3), 1528–1533. https://doi.org/10.35940/ijitee.c8567.019320

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free