Construction of D-runway at Tokyo international airport

7Citations
Citations of this article
18Readers
Mendeley users who have this article in their library.

Abstract

In August 2010, the fourth runway called D-Runway (2,500-m long) was completed off the shore of the Tokyo International Airport (Haneda Airport), which is the fourth largest airport in the world in terms of passengers handled. Since the D-Runway is situated at the mouth of the Tamagawa River, a hybrid structure combining a piled-elevated platform and land reclamation was planned so that it would not obstruct the flow of the river. In the reclamation area, a slope-type rubble mound seawall was constructed on the soft clay seabed, which was improved using the sand compaction pile method, with a total of 52 million cubic meters of soil, sand and rock used in the land reclamation. The piled-elevated platform is a massive 520,000-m2 structure in which 198 prefabricated steel jackets supported by 1,165 steel-pipe piles were connected together by welding on site. This project required huge quantities of construction materials, including 470,000 tons of steel and 450,000 m3 of concrete. The D-Runway was successfully constructed in just three and a half years thanks to the rapid construction method and a continuous 24-hours-a-day work schedule. This paper outlines the D-Runway project and its main structures.

Cite

CITATION STYLE

APA

Mizukamii, J., & Matsunagaii, Y. (2015). Construction of D-runway at Tokyo international airport. In 15th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering, ARC 2015: New Innovations and Sustainability (pp. 122–134). Asian Regional Conference on Soil Mechanics and Geotechnical Engineering. https://doi.org/10.3208/jgssp.ESD-KL-4

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free