Pengembangan Algoritma Hybrid Flowshop Three-Stage Dengan Mempertimbangkan Waktu Setup

  • Utama D
  • Garside A
  • Wicaksono W
N/ACitations
Citations of this article
31Readers
Mendeley users who have this article in their library.

Abstract

… jumlah job yang besar. Kata Kunci: penjadwalan produksi, hybrid flowshop three stages, algoritma Pour, waktu setup. I. PENDAHULUAN1 Penjadwalan produksi memiliki arti perencanaan urutan pengerjaan job …

Cite

CITATION STYLE

APA

Utama, D. M., Garside, A. K., & Wicaksono, W. (2019). Pengembangan Algoritma Hybrid Flowshop Three-Stage Dengan Mempertimbangkan Waktu Setup. Jurnal Ilmiah Teknik Industri, 18(1), 72–78. https://doi.org/10.23917/jiti.v18i1.7683