Co-optimization of energy and reserve capacity considering renewable energy unit with uncertainty

11Citations
Citations of this article
30Readers
Mendeley users who have this article in their library.

Abstract

This paper proposes a system model for optimal dispatch of the energy and reserve capacity considering uncertain load demand and unsteady power generation. This implicates uncertainty in managing the power demand along with the consideration of utility, user and environmental objectives. The model takes into consideration a day-ahead electricity market that involves the varying power demand bids and generates a required amount of energy in addition with reserve capacity. The lost opportunity cost is also considered and incorporated within the context of expected load not served. Then, the effects of combined and separate dispatching the energy and reserve are investigated. The nonlinear cost curves have been addressed by optimizing the objective function using robust optimization technique. Finally, various cases in accordance with underlying parameters have been considered in order to conduct and evaluate numerical results. Simulation results show the effectiveness of proposed scheduling model in terms of reduced cost and system stability.

Cite

CITATION STYLE

APA

Hassan, M. W., Rasheed, M. B., Javaid, N., Nazar, W., & Akmal, M. (2018). Co-optimization of energy and reserve capacity considering renewable energy unit with uncertainty. Energies, 11(10). https://doi.org/10.3390/en11102833

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free